The owner wants the building to be redesigned completely so that it is adequate to apply for a Tourism Certificate, wants to use the terrace for seating customers, wants a fire escape and to plan the floors so that it can support multiple areas of business (bank branch, restaurant, café, bar, supermarket).
Current State:
- 3 floor building with terrace.
- 2nd Degree Historical Building.
- Does not comply with municipality and fire codes.
- Does not have designated kitchen area.
- Does not have designated WC area.
- Does not have an elevator.
- Does not have heating system.
- Does not have fire escape.
- Is not suitable to apply for a Tourism Certificate.
Cosmo Services:
- Search and appoint architect whose expertise is conversion of 2nd degree historical buildings.
- Search and appoint Consultant for Tourism Certificate regulations.
- Coordination between owner-architect-consultant-municipality to develop final project.
- Approval process of project by Regional Heritage Board, Municipality and Ministry of Tourism.
- Budgeting, construction, and fit out process after approval from agencies.